Inspection In Progress

MD CMRL along with Director Projects
MD CMRL along with Director Projects and Officials Of CMRL and GC at Trail Run between Little Mount station and Nanganallur Road Station on 16-10-15.
TC Car of Train 15
TC Car of Train 15 undergoing water tightness test in Sricity factory (13-04-2014).
Chennai Metro Rail Inauguration
Chennai Metro Rail Inauguration Function (29-06-15)
WORK IN PROGRESS AT THOUSAND LIGHTS STATION
WORK IN PROGRESS AT THOUSAND LIGHTS STATION (28-11-2014)
WORK IN PROGRESS AT THOUSAND LIGHTS STATION
WORK IN PROGRESS AT THOUSAND LIGHTS STATION (03-09-14)
Aerial view of LIC Station
Aerial view of LIC Station (30-07-2014).
Work in progress at OTA
Work in progress at OTA (22-10-2012).
Work in progress at Sidco
Work in progress at Sidco (22-10-2012).
Ramp D-wall Cage Lifting at Thirumangalam
Ramp D-wall Cage Lifting at Thirumangalam (12-10-12).
Mast Erection Work in Progress
Mast Erection Work in Progress(07-09-2012).
Tunnel Work in Progress at Nehru Park
Tunnel Work in Progress at Nehru Park(28-08-2012).
Tunnel View
Tunnel View after fixing of segments by TBM-14.08.2012
Tunnelling work in progress at Washermenpet
Tunnelling work in progress at Washermenpet (22-01-2013).
TBM Preparatory Work at Nehru Park(03-07-2012)
TBM Preparatory Work at Nehru Park(03-07-2012)
Thiru.K.Rajaraman,IAS., Managing Director
Thiru.K.Rajaraman,IAS., Managing Director, CMRL hoisting the National Flag on 15.08.2011 to mark the Independence Day Celebrations at CMRL office(15.08.2011).
construction work of elevated corridor
construction work of elevated corridor
TC Car of Train 15 undergoing water tightness test in Sricity factory (13-04-2014).
TC Car of Train 15 undergoing water tightness test in Sricity factory (13-04-2014).
construction work at SIDCO metro stations.
construction work at SIDCO metro stations.
Construction work of elevated corridor
Construction work of elevated corridor
CMRL plans 10 saplings
CMRL plans 10 saplings for each tree felled. so for 1600 saplings have been planted in various places.(11-01-2011)
CMRL plans 10 saplings for each tree felled
CMRL plans 10 saplings for each tree felled. so for 1600 saplings have been planted in various places.(02-02-2011)
Signing of agreement between CMRL
Signing of agreement between CMRL and a joint venture of Johnson Lift Pvt Ltd and SJEC Corporation for supply of lifts and escalators.(14.2.2011)
The Chairman Mr.Navin Kumar,IAS.,
The Chairman Mr.Navin Kumar,IAS., after inspecting the work at the casting yard recording his observations in the visitors book.(15-02-2011)
Directors inspected the work sites of the Chennai Metro Rail Project
The Chairman Mr.Navin Kumar,IAS., the Managing Director Mr.K.Rajaraman,IAS., and the Board of Directors inspected the work sites of the Chennai Metro Rail Project.(15-02-2011)
Directors inspected the work sites of the Chennai Metro Rail Project.(15-02-2011)
The Chairman Mr.Navin Kumar,IAS., the Managing Director Mr.K.Rajaraman,IAS., and the Board of Directors inspected the work sites of the Chennai Metro Rail Project.(15-02-2011)
Directors inspected the work sites of the Chennai Metro Rail Project.(15-02-2011)
The Chairman Mr.Navin Kumar,IAS., the Managing Director Mr.K.Rajaraman,IAS., and the Board of Directors inspected the work sites of the Chennai Metro Rail Project.(15-02-2011)
Metro Rail Project in the Board Meeting held at Chennai
A Memorandum of Understanding was signed between the G O I and Government of Tamil Nadu for the Joint Venture of the Chennai Metro Rail Project in the Board Meeting held at Chennai on 15.2.2011.GOI released Rs.652 crores for CMRL immediately on signing the MOU.
Signing of agreement between CMRL and M/S Siemens
Signing of agreement between CMRL and M/S Siemens AG, Germany and Siemens Limited, India consortium for traction /substation, power supply system and OHE.(18.2.2011)
M/S Larsen & Toubro Limited
An agreement was signed between CMRL and a joint venture of M/S Larsen & Toubro Limited, Chennai, M/S Alstom Transport SA and M/S Alstom Projects India Ltd for design and construction of track works.(18-02-2011)
platform screen doors and telecommunication.(9.3.2011)
Signing of agreement between CMRL and M/S Siemens AG, Germany and Siemens Limited India consortium for signalling, platform screen doors and telecommunication.(9.3.2011)
An agreement was signed between CMRL
An agreement was signed between CMRL and M/S Voltas India Limited for design and build work of underground stations air conditioning on 11.03.2011
Design and build works of tunnel ventilation system on 11.03.2011.
signing of agrement between CMRL and M/S Emirates Trading Agency LLC Dubai and M/S ETA Engineering LTD India for Design and build works of tunnel ventilation system on 11.03.2011.
The Chennai Metro Rail Limited is nursing about 15000 tree
The Chennai Metro Rail Limited is nursing about 15000 tree saplings. Of these 2400 were planted. These saplings will be planted as substitute for the trees that are felled on in the ongoing sites where works are in progress.(04-06-2011)
D-wall machines at May Day Park.(17-06-2011)
D-wall machines at May Day Park.(17-06-2011)
Soil Investigation at Anna Nagar.(25-06-2011)
Soil Investigation at Anna Nagar.(25-06-2011)
Public interaction programme was conducted at Thiru.Vi.Ka Park, shenoy Nagar(06.08.2011).
Public interaction programme was conducted at Thiru.Vi.Ka Park, shenoy Nagar(06.08.2011).
View of Completed Viaduct Structure(19-05-2012).
View of Completed Viaduct Structure(19-05-2012).
TBM Cutter Head Lowered At Washermenpet (04-06-2012).
TBM Cutter Head Lowered At Washermenpet (04-06-2012).
Decking Work in progress at Nehru Park station-10.07.2012
Decking Work in progress at Nehru Park station-10.07.2012
Tunnel Boring works inauguarted by Dr.Sudhir Krishna
Tunnel Boring works inauguarted by Dr.Sudhir Krishna I.A.S, Chairman, CMRL at Nahru park station on 28.07.2012
Depot administrative building depot third roof slab
Depot administrative building depot third roof slab work in progress at koyambedu-30.07.2012
TBM parts lowered at Washermenpet station-30.07.2012
TBM parts lowered at Washermenpet station-30.07.2012
Segment production work in progress for UAA 2 package-31.07.2012
Segment production work in progress for UAA 2 package-31.07.2012
Track laying works in progress-31.07.2012
Track laying works in progress-31.07.2012
Work in progress at Alandur station-31.07.2012
Work in progress at Alandur station-31.07.2012
TBM in process of tunneling at Nehru Park station-02.08.2012
TBM in process of tunneling at Nehru Park station-02.08.2012
Mockup Seat in Drivers Cabin-03.08.2012
Mockup Seat in Drivers Cabin-03.08.2012
Mockup Drivers Cabin-03.08.2012
Mockup Drivers Cabin-03.08.2012
Thiru.K.Rajaraman,IAS., Managing Director
Thiru.K.Rajaraman,IAS., Managing Director, CMRL hoisting the National Flag on 15.08.2012 to mark the Independence Day Celebrations at CMRL office.
Koyambedu station work in progress(07-09-2012).
Koyambedu station work in progress(07-09-2012).

Inspection in progress at Guindy Station during the trail run between Little Mount station and Nanganallur Road Station on 16-10-15