முகப்பு »
NIT No. CMRL/PHASE–II/O&M /000/2024: for the Selection of the “Operation and Maintenance (O&M) Contractor for Chennai Metro Rail Phase II -Corridor-3 ((Madhavaram Milk Colony to Siruseri SIPCOT-II Metro), Corridor- 4 (Lighthouse to Poonamallee Bypass) and Corridor-5 (Madhavaram Milk Colony to Sholinganallur), including Maintenance Depots at Madhavaram, Poonamallee & Semmancheri”.
NIT No. CMRL/PHASE–II/O&M /000/2024: for the Selection of the “Operation and Maintenance (O&M) Contractor for Chennai Metro Rail Phase II -Corridor-3 ((Madhavaram Milk Colony to Siruseri SIPCOT-II Metro), Corridor- 4 (Lighthouse to Poonamallee Bypass) and Corridor-5 (Madhavaram Milk Colony to Sholinganallur), including Maintenance Depots at Madhavaram, Poonamallee & Semmancheri”.