முகப்பு »
CMRL/CP/TDR-43-CON/2025 “Design and Construction of Entry Exit Structures along with Connecting Bridge for Elevated Metro Stations of Corridor 3 at Nehru Nagar, Kandanchavadi, Perungudi, Thoraipakkam, Mettukuppam, PTC Colony, Okkiyampet, Karapakkam and Okkiyam Thoraipakkam Including Civil, Architectural Finishes and all associated works.”
CMRL/CP/TDR-43-CON/2025 “Design and Construction of Entry Exit Structures along with Connecting Bridge for Elevated Metro Stations of Corridor 3 at Nehru Nagar, Kandanchavadi, Perungudi, Thoraipakkam, Mettukuppam, PTC Colony, Okkiyampet, Karapakkam and Okkiyam Thoraipakkam Including Civil, Architectural Finishes and all associated works.”
கடைசியாக புதுப்பிக்கப்பட்டது : May 24, 2025