முகப்பு »
CMRL/CP/TDR-44-CON/2025 “Design and Construction of Metro Station Entry/Exit Structures Integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur and Thoraipakkam Station including Civil, Plumbing, E&M, HVAC, Architectural Finishes and all associated works”
CMRL/CP/TDR-44-CON/2025 “Design and Construction of Metro Station Entry/Exit Structures Integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur and Thoraipakkam Station including Civil, Plumbing, E&M, HVAC, Architectural Finishes and all associated works”
கடைசியாக புதுப்பிக்கப்பட்டது : May 24, 2025